HEAT HERO HIGH PRESSURE INSTALLATION GUIDE

🛡️Warranty

Heat Hero products are covered by a 5-year warranty; all other supplied components are covered by a 1-year warranty.

System Diagram

Installation Instructions

1. High Pressure Unit Install a minimum of 1 metre above the stove and a maximum of 3 away from the stove.
2. Circulation Pump Two pumps (minimum 6 m head) are activated by the pipe stat and set to maximum manual speed.
3. Pipe Thermostat Set to 55°C and fit close to the solid-fuel boiler.
4. Temperature Probe Fit to the stove or gravity flow within 1 metre, without restricting water flow.
5. Thermal Safety Valve Opens at 99°C, circulating water through the 44 kW cooling loop to safely cool the boiler.
6. Expansion Pipe Minimum 3/4″ must be connected to the tee on the high-pressure unit.
7. Heating Storage Tank Minimum 1 meter above the highest point of the heating system.
8. Cold Feed Must be connected to the radiator flow pipe at approx. 200mm away from the expansion tee.
9. Heating Zones At least one radiator zone must be open when the solid-fuel circulation pump is running.
10. Mains Filling Loop Connect to the radiator side to provide system pressure and efficient circulation.
11. Non-Return Valve Use a flap-type gravity non-return valve, not a spring-type valve.
12. Wiring Centre Can be used for multiple zone control.

High Pressure Installation Video

High Pressure Unit Dimensions

Call Art for advice or information.